Marketing Communication. Capital at risk. For Professional Investors Only. Please read fund legal documentation before making any final investment decisions.
Every AI model runs on chips that need a building, a grid connection and constant cooling.¹ Data centre REITs own and operate those buildings, and lease the capacity to the companies developing and deploying AI, including the hyperscalers themselves.²
Key characteristics:
"Data centre REIT" is largely a tax and legal label.⁸ Functionally, these companies are data centre operators: they develop, manage and maintain the facilities, in addition to owning them.⁹ The listed universe includes US REITs such as Equinix and Digital Realty, as well as operators in the US, Asia and Australia that are not always classed as REITs but run the same core business.¹⁰
That broadly consists of owning the buildings that house computing equipment and renting out the space, power, cooling and connectivity that the equipment needs to generate compute capacity. ¹¹

This split defines the business: the landlord collects rent while tenants replace their chips several times over the life of a lease. Which chip or AI model wins does not change who pays the rent.
Much of the AI news flow tracks hyperscaler capex going towards construction of their own data centres: Amazon, Alphabet, Meta and Microsoft have a combined guidance of $720-745bn for 2026.¹² Yet the hyperscalers do not spend only on their own buildings, renting over 40% of their data centre capacity from data centre operators.¹³ The largest spenders in AI are among the largest tenants.
The largest tech companies rent around 40% of their data centre capacity

Hyperscalers are the most visible tenants, but every other company using AI ends up in the same buildings, typically indirectly, without necessarily signing a lease with them:
Some companies also lease space directly: banks, telecoms carriers, large enterprises and AI developers place their own equipment in operators' buildings, next to the clouds and networks they connect to.¹⁷
Whether demand starts with a hyperscaler, an AI start-up or a bank, a large share of it ends up in data centre operators’ buildings. The operator therefore sits beneath the AI stack and is paid by the companies that run on it.
The scarce but essential inputs are grid connection, cooling and land.¹⁸ Securing a grid connection can take years, and lead times are increasing. The average duration from interconnection request to commercial operation went from just over 2 years in 2005 to over 5 years in 2025.¹⁹
Consequently, a facility that is already connected to the grid can deliver capacity far sooner than a tenant starting from scratch.²⁰

The market shows how tight capacity is. Vacancy across primary US markets stood at a record-low 1.4% in H1 2026, 0.2% in Northern Virginia, and 80% of capacity under construction was already pre-leased.²²
US data centre vacancy has fallen to record lows

Even the largest builders use landlord-style structures. Microsoft has said it is classifying more future data centre leases as operating leases.²³ Meta's Hyperion campus in Louisiana sits in a ~$30bn vehicle in which Blue Owl holds 80%, financed largely by debt and leased back to Meta over a horizon of around 20 years.²⁴
Only the largest technology companies and well-funded private capital can build at gigawatt scale. The listed operators' edge is existing powered capacity, scale, and at the retail end, dense networks of interconnected customers.
Hyperscale leases typically run 10-20 years with fixed annual rent increases, and many are signed before the building is finished. Recent transactions show the pattern.
Hyperscale leases run 15 to 20 years


Terms already on Digital Realty's books reflect the same structure: 13.7 years remaining on the lease with a "Leading AI Chip Maker" and 10.8 years with Oracle.³⁰
Long leases provide:
However, they do not remove:
On the other hand, data centre operators with near-term lease expirations can benefit from repricing opportunities. Digital Realty, for example, has approximately 30% of its portfolio (by annualised base rent) expiring through to 2027.³³ The company has upgraded its rental rate growth on renewal leases (cash) from 6-8% as of February 2026, to 9-11% as of July 2026, signalling growing pricing power.³⁴ This is consistent with the annual increases in average asking rental rates across primary U.S. markets since 2021.³⁵
US data centre rents have risen for four consecutive years

AI spending flows through three layers: the chips and servers that compute, the networks that connect them, and the facilities that house and power them.³⁶ Data centre operators own the third layer, and they are paid on a different clock from the first.³⁷

Digital Realty's signed-but-not-yet-commenced leases illustrate the lag. Of $1.4 billion in annualised rent at its share, about $635 million was scheduled to commence in H2 2026, $480 million in 2027 and $312 million in 2028 and beyond.³⁹
The two layers are complements, not substitutes. Every new AI cluster needs a powered building, and the tenant typically renews or replaces its chips several times within one lease.⁴⁰
US REITs must distribute at least 90% of their taxable income to shareholders to keep their tax status.⁴¹ Data centre REITs therefore pay regular income, which is somewhat uncommon among AI beneficiaries: most chipmakers and AI platforms pay little or no dividend.⁴²
Payout policy reflects a trade-off. Equinix, for example, retains around half its cash flow to fund development; higher-payout REITs rely more on debt and new equity to grow, which ties their growth to the cost of capital.⁴³
Data centre REITs' dividend yields

This document is not intended to be, or does not constitute, investment research as defined by the Financial Conduct Authority.
1 IEA (2025) Energy and AI: Energy Demand from AI
2 Nareit (2026) Discover Data Center REITs
3 Ibid
4 Synergy Research Group (7 Apr 2026) Hyperscale Operators to Account for 67% of All Data Center Capacity by 2031
5 Energy Markets & Planning (June 2026) Queued Up: 2026 Edition
6 DatacenterDynamics (23 Oct 2025) Applied Digital Secures $5bn, 15-Year Lease with Hyperscaler at North Dakota Data Center Campus
7 Nareit (2026) How to Form a REIT
8 Ibid
9 Digital Realty (Oct 2025) Form 10-Q, Q3 2025
10 NEXTDC (2026) About NEXTDC
11 Nareit (2026) Discover Data Center REITs
12 MLQ.ai (2 Aug 2026) Big Tech's 2026 Capex Range Reaches $720 Billion to $745 Billion
13 Synergy Research Group (7 Apr 2026) Hyperscale Operators to Account for 67% of All Data Center Capacity by 2031
14 AWS (2026) What is Cloud Computing?
15 Synergy Research Group (7 Apr 2026) Hyperscale Operators to Account for 67% of All Data Center Capacity by 2031
16 SEPA (20 Apr 2026) U.S. Data Center Gold Rush Drives Surge in New Utility Tariffs
17 Ibid
18 Ibid
19 Energy Markets and Planning (Berkley Lab, 2026)
20 Ibid
21 LEK (February, 2025) Build vs Lease: The Hyperscale Landscape
22 CBRE (2026) North America Data Center Trends H1 2026
23 Benzinga (Jul 2026) Microsoft Stock Surges After-Hours: Amy Hood Touches on Surging CapEx
24 EnergyNow (2 Feb 2026) The $3 Trillion AI Data Center Build-Out Becomes All-Consuming for Debt Markets
25 Digital Realty (29 Jun 2026) Form 8-K: Purchase of Blackstone Interest in Three Northern Virginia Data Centers
26 MLQ.ai (28 May 2026) Applied Digital Signs $7.5B Lease at Polaris Forge 3
27 DatacenterDynamics (23 Oct 2025) Applied Digital Secures $5bn, 15-Year Lease with Hyperscaler at North Dakota Data Center Campus
28 Applied Digital (29 Aug 2025) Applied Digital Finalizes Additional 150MW Lease with CoreWeave in North Dakota
29 EnergyNow (2 Feb 2026) The $3 Trillion AI Data Center Build-Out Becomes All-Consuming for Debt Markets
30 Digital Realty (23 Jul 2026) Q2 2026 Earnings Press Release and Supplemental Information
31 CRE Financial Council (2026) Data Center E-Primer: Understanding the New Infrastructure of the Digital Economy
32 Ibid
33 Digital Realty (Sep 2026) Investor Presentation: September 2026
34 Ibid.
35 CBRE (Feb 2026) North American Data Center Trends H2 2025
36 MLQ.ai (2 Aug 2026) Big Tech’s 2026 Capex Range Reaches $720 Billion to $745 Billion
37 Ibid
38 Digital Realty (23 Jul 2026) Q2 2026 Earnings Call Transcript
39 Digital Realty (23 Jul 2026) Q2 2026 Earnings Call Transcript
40 Ibid
41 Nareit (2026) How to Form a REIT
42 Data Derived from Bloomberg L.P. (Accessed October 2026)
43 Data Derived from Bloomberg L.P. (Accessed October 2026)